HomeMy WebLinkAbout08-27-2015 Work Session MinutesJ ] = VqLLEJOINT StrHOBL DISTRICT NT]. 93
"Student .gucce.t.t lryt Desi17n "
3497 North Ammon Road, ldaho Falls, ldaho, 83401 0 (208) 525-4400 0 Fax (208) 529-0104 0 www.dg3schools.org
Dr. Charles l. Shackett, Superintendent Marjean Mcconnell, Deputy Superintendent scott wool5tenhulme, Assistant superintendent
Work Session of the Board of Trustees
Thursday, August 27,2015 at7:30 PM
District Board Room
Call to Order
Chairman McBride called the meeting to order at 7:32 p.m. This meeting is to prepare to bring a solution to the voters. The
students are our goal and what is best for them. He stated that at the end of this meeting he would hope we will have a clear
direction for the District Administration to prepare a resolulion to take to the voters. He hopes this process will bring good
minds together so this problem can be solved and the community can support the decision so we can move forward and do
what is best for the children.
Vice Chairman Paul Jenkins shared his involvement with the transportation department at an event recently held in Blackfoot.
Bonneville Joint School Dislrict's Transportation Department is top-notch in the state and other districts are implementing their
programs. He expressed appreciation for Karen Judy, the manager of the Transportation Department. lvlr. Jenkins also
expressed his admiration for lvlrs. Michaelena Hix for her direction and instruction for Singapore Math Conference combined
with District 91 held this week. He expressed appreciation to all the staffand faculty and their dedication to education.
ll. Roll Call
Chairman Brian McBride
Vice Chairman Paul Jenkins
Treasurer Amy Landers
Trustee Jeff Bird
Trustee Greg Calder
present
present
present
present
present
lll. Welcome Visitors and Deleqations
Chairman McBride welcomed Superintendent Chades Shackett, Deputy Superintendent Marjean Mcconnell, Assistant
Superintendent Scott Woolstenhulme, Chief Financial Officer April Burton, Director of Safe Schools, lvlaintenance and
Operations John Pymm, Energy Conservation Specialisl Don Trauntvein, Director of Curriculum and lnstruction lvlichaelena
Hix, Director of Human Resources Dr. Shalene French, Communications and Community Relations Phil Campbell, Bonneville
Online & Telford Academy Principal Ty Salsbery, Sandcreek Middle School Principal Lyndon Oswald, Rocky Mountain Middle
School Principal Jason Lords, Rocky Mountain Middle SchoolVice Principal Thomas Kennedy, Bonneville High SchoolVice
Principal Levi Owen, Hillcrest High School Principal Doug l\4claren, Technical Careers High School Principal Craig lvliller,
Cloverdale Principal Jeanne Johnson, Elementary l\4ath Specialist Rodd Rapp, Mike Jarvis, Substitute Coordinator Wes Jones,
Eric Heringer, lvlark Bird, Renee Cook, George Bidstrup, LeAnn Belnap, Robert Haller, Katie Kress, Cory Dennert, Heidi Roth,
Ned Sweat, Anna Jean Sweat, Dennis McArthur, Linda lvlcArthur, Karla Harris, Skye Larsen, Tammy Andrus, Ben l\.4oon, Susan
l\4oon, Heidi Southwick, Boyd Southwick, Angie Morgan, Kim Williams, Mark Pettet, and Board Clerk Mary lvlortenson.
Items for DiscussionA. Bonneville Joint School District No. 93's 15 Year Plan - Scott Woolstenhulme
Mr. Woolslenhulme stated that is not just a plan for build a high school, but a plan looking foMard to meet the needs of
our growing enrollment throughout the District. To thoroughly review these options, parents, principals and faculty would
be involved in the discussion. lt is not a comprehensive plan, but a look at what bonds will be needed over time as our
student capacity needs increase and to help in the llnancial analysis. As it pertains to the elementary schools, the groMh
rates in the District varies; some areas have a much higher groMh rate than others and we do not have historical data
from some of the elementary schools for enrollmenl projections. The high school classroom trailers would be replaced
with permanent classroom wings; renovations are not included in this currenl plan.
B. Dg3 Solutions Proposal - Jeff Bird
The D93 Solution Committee's presentation tonight is to present to the Board and the community our plan to build a
middle school flrst. Elementary enrollment is increasing and the middle school and high schools are overcrowded. A
solution is needed and we feelwe have better options than the last three bonds that have failed. There are two proposals
for this middle school - a Jr. High school (7rh-9th grades) which would pull the 9'h graders out of the high school thus
reducing the overcrowding OR annexing Sandcreek lvliddle Schoolwith Hillcrest High School to create a larger high
Board ofTrustees Brian McBride PaulJenklns Amy Landers leff Bird GreB Calder
t.
school and build a middle school for the 7h and th graders. Thiswould create three middle schools beding intotwohigh
schools. Another high schoolwould need to be built in 9-10 years. This plan solves two problems, increased enrollment
and overcrowding, with one bond.
Capacity numbers have many variables to consider, i.e., Seminary, online students, work release, etc. as well as the
difference ofenrollment between l"rperiodvs.4th period, perse. The financial analysis presented this week does not
showthecostif a middle school is built first. Since the numbers of enrollment fluctuate so much, itis hard to pinpoint
which plan is better, the Jr. High school or annexing Sandcreek and Hillcrest. This makes it difficult to propose a solid plan
without current iniormation. Further vetting onthe issues and proposals is necessary to have a clear view ofthe numbers
for capacity and enrollment for the middle school/Jr. Hagh school options.
We would like to i3rm a 50 member Citizen Committee from a sampling of the voters from the past three bonds to discuss
these two proposals before us. We also feel it would be beneficial to have a phone survey both sides can agree upon and
getting it out to the community to see where the support falls.
Mr. Pettet stated the impact of constantly changing numbers can swing the overcrowding issue 5-'10% in the high schools'
capacity or attendance figures. lt is difficult to select the correct proposal without having concrete data. Mr. Jeff Bird
stated that the extra money from this proposal can be used to cover our debt and can raise the levy $2.8 million without
raising taxes. This would allow for programs and retention of teachers, etc. without raising the levy rate.
ln conclusion, this proposal allows the community lo move forward with a solution to the overcrowding problem for grades
7-12. lt involves one bond and without a tax increase. This proposal needs to be vetted more thoroughly and more
infomation gathered to make the best decision. Mr. Bidstrup expressed that we need more time and not to rush the issue
We need to do what is best for the children, the teachers and staff, and the community.
C. Financial Analysis - Mark Bird
Mr. Mark Bird has been asked by the District to serve on the Finance Committee for the previous bond and the upcoming
bond. Chairman McBride expressed appreciation for Mr. Mark Bird, who has worked on his own time.
Eric Heringer from PiperJaffray had compiled the Dist bt's Bo nd (& Levy) Planning Summary to show comparison of three
bond financing scenarios. The long-term planning dates are the same for all scenarios tor the sake of comparison. This is
only a forecast and subject to change.. Column #1 - a high school plan with the extras, i.e., performing arts center and sports flelds; $66.5 million bond with a
17.5 year term; average monthly tax would be $47.27l$100K taxable value from 2017 -2031
. Column #2 - current District high school proposal; $58.3 million bond (4% increase from last year due to rise in
inflation and construction costs) with a '16.5 year term, average monthly tax would be $46.69/$'100K taxable value
fiom 2017 -2031. Column #3 - current D93 Solutions Committee middle school proposal; $40 million bond with no tax increase with a
16.5 year term; if the term was different could include a tax increase; average monthly tax would be $45.56/$'100K
taxable value from 2017-2031
Total financial impact on either bond in column 2 and 3 is the same: $1.'14l$'1,000 levy rate increase
From a financial point these two proposed plans, column 2 and 3, are virtually the same
Mr. Heringer stated that if you build a high school now when interest rates are lower and a middle school later when
interest rates increase would be more cost effective than building a middle school first and then a high school; but, the
total impact between the two scenarios is not significant. Over the next year, long-term interest rates will increase, but
onlyslightlyi however, interest rates overa long period of time, is hard to foresee. lf you payyourdebtdown sooner, you
pay less money in the long run because you pay less interest.
Market Value GroMh -. Due to increased construction and property values. As populatron increases, tax base increase. Enrollment forecast shows a 2.7% increase in population
. Historically, the average Market Value GroMh is 7.5%. 2013 bond, the Market Value GroMh assumption was 0%. Spring 2015 bond, the Market Value Growth assumption was 2%. Current bond proposal, Market Value Grolvth assumption is 4.28%. High groMh assumption of 6% orgreaterwould allow reduced levy rates and earlier repayment. lfthere is 6% groMh, no increase would be necessary
Levy increase is the amount per $'1,000
Tax increase in the amount per $100K of property value
D. Bond Discuss on - Questions from board
Mr. Pettet asked for clarification from the Distict's Bond (& Levy) Planning Summary on the proposed high school to be
bonded in 2022 under the current middle school proposal, this proposal's intention was to have the high school built in
another 8-'10 years. Mr. Mark Bird explained for this assumption, the timing for the different bonds was the same for
comparison purposes. Building a high school at a later date would have a different impact.
Chairman McBride asked Mr. Jeff Bird to explain how his middle school plan would be a better plan both financially and
logistically. There are two options:. Moving the th grade from the high schools to the '1,200 capacity school creating a Jr. High. Annexing Sandcreek Middle School and Hillcrest High School to create a larger 2,200 student high school with 9b
grade students remaining at the high school and forming a small campus.. Annexing would create a large 5A school for Hillcrest, leaving Bonneville High School at the 4A level
. Sandcreek would be replaced by the 1,200 middle school, increasing the middle school capacity by 300 students. Annexing would cause both the high and middle schools to be a fullcapacity on opening day. Build another high school in 2026 when enrollment has increased to today's level. Mr. Jeff Bird prefers the Jr. High proposal over annexing Sandcreek and Hillcrest schools
Other concerns:. Creating three Jr. Highs would entail boundary changes which would then increase their enrollment. Classroom trailers will still be needed with over-capacity issues unless both schools are built. lf a new high school is built first, the third middle school would be built once all three high schools are at 75% capacity. Enrollment numbers are a moving target; 32 students enrolled at Bridgewater elementary iust tonight that we did not
anticipate. Enrollment numbers change daily and capacities change when programs come and go. That's just the
reality of schools.
Chairman McBride posed this scenario - lf we were all 3'd graders and took a bus ride to each high school and counted
classroom trailers, could we say there was an overcrowding problem? Currently, there are eight (8) trailels at Hillcrest
High School and six (6) at Bonneville High School. lt would be obvious that the high schools are over capacity.
Chairman McBride asked Bonneville Online Principal, Ty Salsbery to address the capacity and enrollment ofthe online
schools and how that effects the brick and mortar schools:. Online students are considered full-time students and are counted in the enrollment numbers. Currently, there are 110 full-time online students in grades 7h-12th. Part-time online students are counted in both the capacity and enrollment numbers in their home schools. Many part-time online students take their classes after regular school hours or during the summer. Most of the online students use District computer labs for their classes
Mr. Woolstenhulme explained the Seminary classes relatjng to capacity and enrollment:. Best to view c:pacity taking into effect the number of teachers is a direct function of the number of students we have.. For every 23 students the state gives us one (1) teacher.. Seminary students are counted in our enrollment numbers; Hillcrest High School has 800 students taking Seminary.
That does not mean we subtract them from our capacity numbers. These students still take seven (7) more classes.
We cannot not count them. We still receive funding from the state for each of these students, therefore they are
included in the capacity and enrollment numbers.. lf Seminary did not exist, the number of teachers would not increase, but the class size would.. Due to the teacher's prep period, teachers teach 75% of the time, thus raising the average class size to 30+ per
classroom.. Students in Seminary or taking online classes, drops the average class size to 27.5 students per classroom. This does
not help our capacity numbers, because we still need a teacher for every one of those students.
l!lr. Bidstrup suggested we use the classroom trailers as office space, where the teacher's prep periods are used, freeing
up the classrooms for instructional purposes vs. prep time. This could be used as a flexible solution. Mr. Woolstenhulme
explained this would increase the number of roaming teachers. A major mncern is the passing periods gettjng from
classroom to classroom with the overcrowding in the hallways. Even if we used every classroom 100% ofthe time, space
would still be Iimited.
Trustee Calder concludes that the capacity analysis is of interest to the Board and was also requested by the D93
Solutions Commitlee which presents a more precise way of looking at capacity and classrooms usage and has been a
helpful process. Mr. Jetf Bird stated since the capacity of the schools are not stable imposes a bigger impact on the final
levy rates and the money coming into the District and the final numbers of a high school being bonded at a later time as
assumed. The 2-3 year buffer zone would be best for the middle school proposal. Both bond proposals agree on the
projected enrollment numbers.
Mr. Woolstenhulme defines capacity as -. lntended Capacity- based on architectural design. Building Capacity - '150 square footage per studentt large commons areas can affect the capacity of the schools.. Classroom Capacity - 35 square footage per student per classroom. lnstructional or Practical Capacity - includes State funding for teachers and student enrollment
Other consideration include when Split Sessions will need to established and when do we stop adding classroom trailers.
Bottom line - every teacher needs a classroom to teachl (students are a variable to the teacher, as defined in State
statute) Currently, both the high and middle school enrollments have increased by 100 students.
D93 Solutions Committee acknowledges there are state requirements for the number of students per teacher; however, in
our discussions it came down to how many instructional units and how many students can be in those units. Therefore the
capacity numbers lyould entail the number of instructional units per school and then the average number of students per
instructional units. We need to decide which real numbec we are going to key in on - state requirements, instructional unit
approach, Seminary and online student numbers - how can we choose which proposal is best when we do not have a clear
understanding of the numbers?
Trustee Calder summarized the purpose of tonight's meetang was to better understand the D93 Solution Committee's
proposal. Although D93 Solutions Committee's data was fair and the Committee feels further vetting is required, at was
empty of conviction - there was no mention of what's best for students, not any solutions to save money, or anything about
previous claims made by the D93 Solutions Committee. According to Mr. Mark Bird's and Mr. Heringer's financial analysis,
there is no financial benefit to doing the D93 Solutions Committee's proposal frrst. Since the last 2-3 years of bond proposal
planning and research, it is still obvious there is a overcrowding issue, that the existing proposal that has been voted on the
last two years is not a bad proposal or that your proposal is better.
Chairman McBride concurs with Mr. Jeff Bird that the community should have a say about the Jr. High proposal in a
possible survey. Treasurer Amy Landers said that last year a survey was sent out by a community committee about the
middle schooloption and it failed. Trustee Calder reminded usthatin a previous meeting this year, a joint survey was
discussed, but after D93 Solutions Committee had completed their own survey, the joint survey no longer seemed
necessary. However, the D93 Solutions Committee did not share the findings from their survey. Mr. Jeff Bird deliberates we
are too close to the bond resolution deadline to run a survey at this point; however, would like to survey the community on
the two options, middle school vs. high school, where the community would choose one option or the other.
Mr. Pettet stated that tonight the D93 Solutions Committee's plan was to present an idea, but did not want to or were
prepared to present or discuss financial data. Once agaan, D93 Solutions Committee feels that further vetting of the
financial data presented tonight still needs to occur. Chairman McBride reminded the D93 Solutions Committee that all the
fnancial data used by the District in the past discussions is public record; however, the D93 group has not presented any
new data to validate D93 Solutions Committee case. Tonight the Board was looking for an idea or proposal that would state
thatbuilding a m iddle school first was the best idea. The Board understands that we will do betterif wesell ourbonds in
January and to bid construction costs earlier in the year.
The School Board finds it difficult to accept the D93 Solutions Committee plan due to a lack of transparency of who is on
the committee and an unwillingness to invite the stake holders, teachers and administrators who work in education, to be
involved. Although the D93 Solutions Committee's plan has been deemed "Jeff Bird's Plan", Mr. Bird states he is not on
the committee. The School Board just wanted to know from D93 Solutions Committee presentation what the numbers were
and why the committee felt this was the better proposal.
Chairman McBride invited the principais in attendance to share their thoughts on the two proposals.
Sandcreek Middle School Principal Lyndon Oswald -. I like the idea ofthe office trailers vs. classroom trailers, planning pods are common.. When the school was built, all three 100 ft hallways were lined with lockers; the 1,200 current lockers does not reflect
the building's capacity.. Sandcreek currently has three roaming teachers and 39 classroom teachers. All current classrooms are utilized. Having the grh graders included in our school would pose other concerns:. Dances would be hard to control.. Would require a diversified staff; teachers certified to teach 7h and 8th grades cannot teach th grade.
. th graders need to track their credits towards graduation requirements.. Teacher pools are shallow; quality instruction is very important.. Upper level classes would not be available to the high academic students.
Vice Chairman Paul Jenkins - "This is the first time tonight we have spoken about childrenl'
Rocky Mountain Middle School Principal Jason Lords -. Our key focus is doing what is best for students; Bonneville Joint School District 93 has always been pro-active in
promoting innovative programs and changes.. District 91 has moved their grh graders from a Jr. High bacl to the high school.. There are more students in the north pa( of the district than in the south; moving the th graders into a Jr. High would
create major boundary changes.. Other concerns would be intermingling the th grade boys with the 7b grade girls.
Hillcrest High School Principal Doug McLaren -. lf a 9s grader fails one core class, they would be at risk for graduation;. lf a 9s grader fails two or more core classes, there is almost no hope for graduation.. Our concern would be for students coming to the high school behind in their credits needed for graduation and not
being able to catch up.. th graders are important to the culture of a high school.
Chairman McBride had called Dr. Thomas from Madison School district in Rexburg prior to this meeting. Dr. Thomas stated
The argument could go either way between a Jr. High and a middle school.
The main concern is what is more destructive to the students.
The trend today is moving the 9b graders back to the high school where there are more academic opporhJnities for the
students.
There are huge behavioral challenges between the 7h graders and the gth graders.
Bonneville High School Vice Principal Levi Owen -. Taking about students is more important than talking about numbers.
. Bonneville Hgh School has many unique programs
. lt is difficult for a Chemistry or Business teacher to roam from room to room for instruction.
. Our main enrollment numbers differ by the student needs.. We need to consider the whole high school experience and education and not just the academics.. A 10h grade student, as a first year high school student, has more chance of falling behind in their graduation
req u irem ents.. Extra and Co-curricular opportunities are very important for the high school studenti experience of a student is more
important than numbers.. The best plan was to build both a middle school and a high school.
Treasurer Amy Landers asked the principals their opinion on the annexing Sandcreek Middle School and Hillcrest High
School and creating a 2,200 student school -
Hillcrest High School Principal Doug McLaren -. lf this was the decision of the Board, we would make it work.
. Passing period would be increased form four (4) minutes to ffteen (15) minutes.
. lncreased supervision between passing periods would be needed.
. Each building would require its own office staff and administrator.
. Possible to place the AP and Dual credit classes in Sandcreek and possibly add more class choices.
. Safety, especially during winter months is a major concern.
. The high school would gain another gyml
. The more students lhere are in a school, the less chance there is for those who wish to participate in extra and co-
curricular activities, sports and in the performing arts programs.
. More sections ofclasses can be added when there are more students to flllthose sections.
. Hillcrest would need another 800 students to reach capacity enrollment of 2,200 students.
Treasurer Amy Landers asked what the impacts would be on Bonneville High School wath the boundary shifrs to fill the big
high school.. Bonneville students would not have the same opportunities for academics, activities or sports as those in the larger
school.. Bonneville would drop to a 44 level of competition; there is sense of prestige to be a 5A school and to complete at that
level.. School culture would change depending on the size of the school.
. How often would the boundaries need to move as the enrollment numbers change over time?. Open enrollment would still be an option for students wishing to attend either school.
Chairman McBride questioned how the D93 Solution Committee's plan would rate academically and for the children.
Trustee Bird concluded that the 76-9h grade Jr. High plan was the one option he would support, this plan would also grve
the District an e)dra $2.8 million to\r,/ards the Supplemental Levy, which can be used for the education of our children.
Trustee Calder commended the D93 Solutions Committee for a good faith effort in presenting this alternative plan,
however, he has not heard anything that makes that plan the better choice or more likely to pass.
Chairman McBride asked the Director of Safe Schools, Maintenance and Operations John Pymm what the safety concerns
are for combining the middle and high schools:. Annexing these schools is not much different than the annexing we currently have with the classroom trailers and
Seminary buildings.. Not using the classroom trailers would eliminate safety hazards.. Control of the building perimeter and building access would increase.. Currently, we are creating soft targets, an easier access for perpetrators.
. lncreases the chances of slips and falls for both faculty and students.
Mr. Woolstenhulme reported that currently in the nation, 80% of the high schools have grh grade students. There is no test
data comparison between a Jr. High and a Middle school. Since 2005, ten schools in ldaho have moved th graders back to
the high school environment.
Chairman McBride expressed appreciation for the interest and time taken by the D93 Solutions Committee in the process of
making these important decisions as they pertain to the education and what is best for our children. lt is not an easy
process. The decisions before us tonight are to decide when to run the next bond and whether the middle school/Jr. High
school model or high school model is the best or to run a community survey to understand better the concems and views of
the community.
Vice Chairman Jenkins questioned much can we bond without raising taxes. Mr. Mark Bird explained it depends on how
long you make the bond and the interest it accrues.
Chairman lvlcBride recessed the meeting at '10:20 p.m. for a short break and called the meeting back to order at '10:32 p.m.
He opened a fifteen (15) minute public input segment for allthose who wish to express comments or concems. Each
participate would be allotted one (1) minute to speak. He reminded the audience that this work session istodecideon the
direction for the District, but would not include any voting on the issues. Topics included:. Love to see ditferent options, such as big mega school with 3,200 studenb. Compliment to Chairman McBride for leading this board and keeping perspective; the question is whether you do the
bond for the building or do something that the people will pass.
. Excited aboutthe Ag Program atTechnical Career High Schooll lt's time to pass the bond and reunite the community.. lt's not about money - it's about what is best for children, safety, education, and families.. Boundary changes are hard on everyone.. Asking the public's opinion through a poll or survey should be considered.. With three children in Bonneville Joint School District 93, what is best for students needs to be top priority when
decisions are made.. Quality of input and viewpoints are appreciated.. Appreciate the principals' comments. Each community has it own personality
. Safety is important.. lfyou are too flexible with the bond monies, you will lose votes.
. Moving 96 graders is not a wise choice.. Many four year programs are available for students to earn real-life skills, such asthe CNA program. lf the th graders
are moved into a Jr. High, they lose those opportunities available.. Tax increase is okay if it is for children.
Chairman McBride asked for the Board's thoughts on the contents of this meeting and the possibility of running another
survey:
Trustee Calder - I adm ire all those who are here tonight; you're awesomeandyou care. We havea huge problem right now
and it is getting worse by the day. We have had lots of meetings and time to consider our options. Capacity and enrollment
numbers are a moving target. lntheschool system, perfect information does not exist. l'm leaning towards runningthebond
again in November and leaning towards the high school option. Running a survey would be a good idea and helpful, if there
was time to do it. lsuggestthatwe run thebond in November and if itdoes notpass, thendoasurvey.
Vice Chairman Paul Jenkins - I feel the suNey that was done was statistically good, I am not sure if we would gain anything
by running another one. I stand neutral; if we did a survey, it would not change my viewpoint.
Mr. Woolstenhulme reviewed last year's survey compiled by the Facilities Committee. Four areas were vetted. High School Plan (45o/o-47o/o)
. Classroom Additions at Hillcrest and Bonneville high schools. Full Renovation at Hillcrest and Bonneville high schools. Annexation (13%)
(the Jr. High plan was not vetted)
On a second survey, 65% of those surveyed would support the high school plan. We did an internal audit about a Jr. High
option and it did not survave; therefore, survey did not go public.
Treasurer Amy Landers - I have had quite a few emails on both sides of the fence, but leaning towards the high school,
emails from those who voted 'No' and encouraging me to vote No the next time and those who voted 'Yes' not to let go of
the idea. Two thirds of our community have voted in favor of the high school. I have not seen the shift of those who voted
Yes to now vote No.
Chairman lvlcBride - I had rec€ived a couple of emails supporting the middle school plan recently which encouraged us to
look at that option. We havedonethat. Thetiming for getting a building built faster would bethe middle school option. But
one thing that changes that for me is that the principals have come up with the trimester schedule which is safer for our
students than going through a tradition split session schedule. That makes a difference for me and I could wait another year
in order to have a high school built.
ln the Jr. High plan, allows the supplemental levy to be increased by $2.8 million, creating more money for education and
allowing more funding to pay down the debts. Mrs. Burton stated that our current supplemental levy would increase to $5.8
million. State funding impacts the need forthe levy. Mr. Mark Bird explained that on the PiperJaffray data both plans
showed a $2.8 million increase to the supplemental levy, the D93 Solutions Committee plan could increase the lew without
a tax increase.
Trustee Bird - I stand by the D93 Solutions Commattee's presentataon; I feel about the same way I did coming in and
expected ittogotheway itdid. lstill feel the survey is the best way to know how the public feels. Weighing the fact that if a
survey is not going to happen, I am against the November bond regardless of the plan and the 4% increase in cost.
E. Board Direction in Movino Forward
Chairman McBride stated we are not taking a vote at this meeting, but giving the District direction of where to move forward,
whether to bond in November and whether to bond for a J r. High school ora high school. The District will prepare a
resolution to present to the voters. The Board will vote on the resolution at the September 9, 20 15 Regular Board Meeting.
The Resolution is due to the Bonneville County Elections offic€ by September 14, 20'15. The Board's process of going
through the different plans has been very important to see the concems of the community and to prepare the voters for the
finaldecision.
Chairman McBride asked Superintendent Shackett what direction the District would like from the Board to move forward
Jr. High School or High School
Bond Election Date
I
2
Board Member
Treasurer Amy Landers
Trustee Calder
Trustee Bird
Vice Chairman Paul Jenkins
Chairman McBride
School Bond Plan Election Date
High School
High School
Jr. High School
High School
High School
November 2015
November 2015
Spring 2016 election
November 20'15
November 20'15
Superintendent Shackett, the School Board of Bonneville Joint School District 93 recommends we prepare to make a
resolution to bond for a high school in November 2015. Another Work Session will take place next week to work with our
bond underwriter and prepare the resolution.
V. Call forAoenda items for Upcominq Meetinqs
A. Regular Meeting - Wednesday, September 9, 2015 - District Board Room - 7:00 p.m.
B. Work Session - Bonneville Student Council - Wednesday, September 16, 2015 - Bonneville HighSchool -
1 1 :30 a.m. - 1:00 p.m.
C. Work Session - Hillcrest Student Council - Wednesday, September 30, 2015 - Hillcrest High School -
1 1 :30 a.m. - 1:00 p.m.
D. Regular Meeting - Wednesday October 14, 2015 - District Board Room - 7:00 p.m.
Adiournment
MOTION: Greg Calder made the motion to adjourn. Amy Landers seconded it. Motion carried. Meeting was adjourned at
11:52 p.m.
APPROV
Chairma n
ATTESTED
Clerk
Date
t4
r_l = v3il-LEJOINT SCHT]OL DISTRICT NO. 93'Student ^,uccess b)t, De-etgn "
3497 North Ammon Road, ldaho Falls, ldaho, 83401 ( (208) 525-4400 0 Fax (208) 529-0104 0 www.dg3schools.org
Dr. Charles J. Shackett, Superintendent Marjean Mcconnell, Deputy Superintendent Scott Woolstenhulme, Assistant Superintendent
9th Grade Placement Memo
9th Grade Placement in tdaho's Ten Largest Districts in 2014
Junior High School High School
Boise
Lewiston
Changes in 9rh Grade Placement in ldaho Schools since 2005
Schools thdt Moved 9th Grode to High School since 2005
. Taylorview JHS, ldaho Falls
. Eagle RockJHS, ldaho Falls
. Claire E. Gale JH5, tdaho Falls
. Rigby JHS, Jefferson
o Lakeland.lHS,Lakeland
. Timberlake JH-SHS, Lakeland
. Moscow JHS, Moscow
. Robert Stuart JHS, Twin Falls
. Vera O' Cleary JHS, Twin Falls
. Burley JHS, Burley
Educational Opportunities
Placing 9th grade students in the high school maximizes educational opportunities for our
students. These educational opportunities include college level courses including dualcredit
and Advanced Placement, as well as co-curricular programs including fine arts, performing arts,
foreign languages, and professional-technical classes.
. 9th grade students at the high school enroll in college-credit classes including Advanced
Placement and dualcredit classes that are not available in middle school.o Fewer foreign language classes can be offered in junior high due to the limited number
of teachers and elective classes.
Board ol Trustees 0 Brian McBride 0 PaulJenkins 0 Amy Landers O Jeff Bird O Greg Calder
Bonneviile loint School District No. 93 is an EqualOpportunity Employer
West Ada (Meridian)
Nampa
Pocatello
Coeur D'Alene
Bonneville
ldaho Falls
Twin Falls
Vallivue
Caldwell
High school co-curricular programs including drama, debate, choir, band, and
professional technical programs provide more opportunitles for participation and higher
levels of competition than can be provided in middle school.
9th grade placement in the high school allows for four-years of participation in co-
curricular programs providing a more complete program for students.
Students would also have 2 fewer elective classes available to them due to the
difference in the high schools' 8-period A-B block and the middle schools' 7-period days.
The followi table shows 9th grade enrollment in hi h school advanced o portunity classes.
Other Educational lmpacts
. 9th grade is required to have 990 instructional hours contrasted with 9OO hours for 7th and 8th
grade students. This would necessitate extending the calendar year or instructional day for 7'h
and 8th grade students in a junior high model.
lolt-2olt S.hool Y..r Fr.rhm.r anrollm.nts
Tot.l iumb.. ol ,..rhm. Dirtricr-$d.l5!
128 15.04%
t67 t9.62%
121 1rt.a5%
l1 2.00%
lta 15.15*
11.s2%98
661
8 70%
69
242
8.11%
33.14%
a19
8 0.9,!%
3.41%29
150 17.63%
11.75%100
H0.06 PhVricalSci€.ce 0 0 00%
o o o0%
t11 20.09%
a5t
*d
ta o,
20lt-2ola S.hool Y..r Fr.!hm.n tnrollm.ntj
Ior{ ftuhh.r .l tr..ima oistrt r-wli.arl
172 14.:!t96
140 16.45%
201 21.62%
26 3.05r(
1,87%67
16.10%117
69t
80
33 3.88%
320 3r.WA
49 s.29%
ara
20 2.35%
5 0.59%
'\67 19.04%
212 24.9t%
Honol3 Phyric.l Sci€me 120 14.10%
o.t2%1
't61 19.52%
5t,
anolllnc.t tr.$r6
rol
l0la.2ol5 Lhool Y... rr6hm.n lnrollm.nL
tot lodLr ., h$nd Dlr|.t.l-lvld. tl!
t27 14 92%
16 5r%141
11 63%99
24 2.E2%
1163%99
117 1315%
607
75 8.81%
3.4t%29
34,18%296
41 a a2%
aat
2t 2.41%
o.71%6
158 16.5
210 24 6A%
Ho.ort Phyiical lti€nce t4.57%t24
012%1
19 t5xt63
61,
Xol
Key Points
o High Schools: Build one L500 / 1800 student high school and complete additions at comprehensive high schools to bring total
comprehensive high school capacity to 4,800
o Middle Schools: Build one 1,200 student middle school to bring total middle school capacity to 3,375
. Elementary Schools: Complete classroom additions to increase capacity at seven elementary schools to 750 students and build three
75o-student elementary schools
. 10-year median annual growth in elementary schools
o +9% median in north-central schools (lona, Cloverdale, Bridgewater, Discovery, Summit Hills)
o 0% median in north-north schools (Ucon, Fairview)
o -7% in south-centralschools (Falls Valley, Tiebreaker, Ammon, Hillview)
a +5% in south-south schools (Woodland Hills, Rimrock, Mountain Valley)
General Obligation Bonds
School Year Projects Completion
Date
Today's cost
(in millions)
Adjusted
estimate
l4Yo annual
inflation)
Total Bond
Amount
(in millions)
201,5-1,6 One 1500/1800 student high school 20t9 S s6.1 ss8.3 s s8.3
2077 -78 Classroom additions at four elementary schools (44 rooms)2079 s 10.6 s 11.9 s 11.9
One 1000/1200 student middle school
Classroom additions at two elementary schools (18 rooms)
2024
2023
Ssz
s4.3
$42.L
Ss.7
S4i .g
2025-26 o One 750 student elementa hool
Classroom additions at one elementary school (12 rooms)
s1s $23.L sss.80
2027 (, o 5q.q
Classroom additions at three high schools (32 rooms)2027 518.4 S28.3
2021-2028 Two 750 student elementary schools S30.o Sso Sso
Total bonding amount necessary through 2030 s223.80 s223.80
2021-22
2027
2029
Levies
School Year Type Annual amount (in millions)
20t6-L7 Supplemental S5.8m
Su pplemental 56.3m
2020-21 . Supplemental
. Plant Facilities
S5.8m
S2.8m
2022-23 Supplemental S7.3m
2024-25 Supplemental S7.9m
2026-27 Supplemental 58.0m
2028-29 Supplemental 59.3m
2030-31 Supplemental S10.0m
201,8-1,9
PiperJaffray.
Bonneville rt. School District 93
Bond (and Levy) Planning Summary
August 27, 2015
Assumptions for Analysis
Ratings
2014 Septemb€r Nel Taxable Value (FY 20'15)
2014 URA Value (FY2015)
Markel Varue Growlh Proiechons
Levy Equalization
Bond Structure
Future Supplemental M&O Levi6
Enhanced'Aal' IsBcrunderllng "Aa3"
Cr6t as ot 782015 Plus 0.50".6
$2,408,168,138
$23,6OL43s
2016&after:4.m%
20% of averaSe amual I&I
Wrapped around eristing bonds
Allowfor inilial innease in 2017 or 2018 thefl increas€ at 406 an.ual rate every two years
Novemh.r 201i Rond Elc.tionSumm.r^ of Sftnirios
True Interest Cost (IIC)
TotalCost
Equaliation (@
Net lotalBond Cost
$665m,0m
u5 years
335%
$26,A37333
Ls8300,000
16.5 years
3.26%
$21,il2,242
$10,000,0m
16.5 yars
3.280/0
sl4840,583
$93,337,333
l$18,667 ,467)
579,402,217
($1s,950,448)
$54,810,683
($10,968,137)
$11.9 nrillion (elementary additions):
Renew Plant Facility Levy at$2.8 million:
947.8 million bond(middle school/elementary additions)r
$79.5 million bond (hi8h shovelementary additions):
(new elementary s.hool/elementary & I lS additions):
S50 million bond (newelementary schools):
0.10per$1,000
0.30 Fr S1,m0
0.10 per Sr,000
0.30 per S1,000
N/A
0.10per$1,m0
N/A
0.58 Fr $1,000
$74,669,866
58,r69366
$53,841,794
55,s41:194
M3,872547
s3,872547
I on8'Rnn8e Plannina:
Avg. monlhly tax for voted s.h@I levies on $l00Ktaxable value (2017-203r ):
Cunrulative Exes Capacily throuSh 2040:
0.42 pe. $1,000 0.42 per $1,000 0.46 p.r $1,000
Long-Range Planniog Sutnnary:
Total Potential tncrea*s (at 4% mrket valueSrowth a$umption)
Total Prin.ipal amount of Bonds:
Total Inter6tmount on Bonds:
Net lnte.6t amoht on Eonds:
1 .21 per $1,000
23Z00O,oOo
106,7m@
3&900,000
270,900,o00
1.14 per $1,000
223,800,000
10r300,0m
36,300,0m
260,1m,mo
1.'14 per $r,000
237,2fi,0m
107,800,000
3&8m,000
?76,0m,uil
47.27
26,400,000
4569
30,300,000 t700,m0
G-23 Drr.lalmer
$0 00
Proje.ted Total Td Rate In.rea* Per $1,0{0 in 2017 from Bond election
Projectd Impaci on S100,000 ofnet t.lxible lalue Monihl
$0.39
$39.00
$0.32
s32 00
$0.00
s0 00
Monrhl
s3.25
Monthl
92 67
lenglh.ommercialtan3adi6n between you and Piperlaffray Pp.rlaflrayhaslinan.i.l.ndolh€rinrer.n!rhardlfierfromvo!rinrerests.
2018 Election -
2021 Election -
2022 El6tion -
2022 Eleclion -
2026 Eletion -
45.55
2028 El(tion -
Middle School First
Proposal
August 27, 2015
The problems
r Elementary school students increasing
> Middle school overcrowding
> High school overcrowding
Ewe rVbodY
\ /e have
knows
ro do
There are better option(s)
S o ET H IN G!
Where is the basis for ANY
Proposal?
r Solid numbers for school attendance and
capacities are critical for decision makers
- Seminaries add to capacity or lowers effective
attendance - still u nresolved
. On-line attendance unaccounted for
Work release unaccounted for
. Financial analysis provided this week does not
accurately reflect middle school first proposal
r These numbers have changed in the last 48
hours
(15 yeat view)
$"# #tflrths.ioor Mrddl.s.h6r
Bond #3
We can address
Two problems
With one bond!!!{k
Bond #2
Bond #l
How can any proposal be
supported without a solid basis?
(attendance vs. capacity)
r ANY proposal cannot be properly understood
and vetted while this information is still
changing
r We have voted 3 times without this
information
r Defensible numbers are needed to build
credibility and support adequate planning
> The following is a brief overview of a possible
so lu tio n
Further vetting is required
, Focus group of a representative sampling of past
voters
lnclude those who voted ves all 3 past bonds, no all 3 past
bonds, and some who changed their position bond to bond
) Do a series communitv meetinos discussino both
plans so we can inforri patroni and get fee-d back
' Do a fair telephone survey' Can be done in October and November 201 5.
' Then, and only then, we will be justified as a board to
vote on a proposal to put on a ballot
' There are huoe risks of trvino to DUsh either Dlan
through with6ut completdly iettinq the middle school
option because we have brand new numbers that
have never been considered until 2 days ago
Proposal
Build a new 1200 seat middle school
. Option A. Annex sandcreek to Hillcrest
. Option B
. 3 Junior Highs feeding 2 High Schools
Conclusion
Middle School First Proposal
" Gets the community moving forward with fixing the
current overcrowding problems
. The most comprehensive solution because it solves
all overcrowding 7-12 wlth I bond and no tax
increase
. Deserves to be investigated more thoroughly
Market value groMh can be split into 2 parts
{1) GroMh throu8h new construction
(2) GroMh in prices for existing buildings
For illustration, assume population groMh is 2,7% peryear. Enrollment growth & market value growth for new construction = 2.7%. To achieve 4% total, prices for existing buildings need to increase 1.3%
Scenarios modeledl. Base scenario:4% (not unrealistic, but conservative). Low groMh: 2% (likely not realistic if population growth continues). High groMh: 6%
Analysis results for S+O.o million
middle schoo! proposal
Analysis results for Ssa.g million
high school proposal
What if growth is 6Yo,
or even greater?
. Repay bonds early
. Use short term on any new bonds
. Reduce the levy rate
2o/o Crcwlh 4% gtowth 6% growth
2017lew increase
2019lew increase
2023 lew increase
2026lew increase
0.32
0.59
0.80
1.27
0.32
0.00
0.00
0.00
Excess capacity in 2040 0.4 m 30.3 m 131.2 m
2v"gtowth 4%Crowth 6% growth
2017 levy increase
2019 levy increase
2023 lew increase
2026 lew increase
0.00
0.00
0.00
0.00
0.00
0.55
1.00
1.9s
0.00
0.10
0.58
0.46
Excess capacity in 2040 4.4 m 8.7 m 73.6 m
Scenario Analysis for
Market Value Growth assumption
o.32
0.10
0.30
o.42