Loading...
HomeMy WebLinkAboutHeadwaters - BHS Remodel Phase 2Certificate Of Completion Envelope Id: A395467B-087E-4B7D-B728-1C69815AF08C Status: Completed Subject: Complete with Docusign: A133-2019 Exhibit A_Final for Signature v2 - BHS Remodel Phase 2.pdf, E... Source Envelope: Document Pages: 56 Signatures: 2 Envelope Originator: Certificate Pages: 2 Initials: 4 Brent Douglass AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-07:00) Mountain Time (US & Canada) 639 W 9500 S Ste 1 Victor, ID 83455 brent@headwaterscc.com IP Address: 207.183.180.131 Record Tracking Status: Original 2/10/2026 9:57:07 AM Holder: Brent Douglass brent@headwaterscc.com Location: DocuSign Signer Events Signature Timestamp Carissa Coats coatsc@d93mail.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 162.255.79.184 Sent: 2/10/2026 10:16:55 AM Resent: 2/10/2026 10:17:52 AM Viewed: 2/10/2026 5:18:00 PM Signed: 2/23/2026 10:36:59 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Brent Douglass brent@headwaterscc.com Vice President - Preconstruction Headwaters Construction Company Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 207.183.180.131 Sent: 2/23/2026 10:37:02 AM Viewed: 2/23/2026 10:42:30 AM Signed: 2/23/2026 10:42:41 AM Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Sam Williams williamsa@d93.k12.id.us Security Level: Email, Account Authentication (None) Sent: 2/23/2026 10:42:44 AM Viewed: 2/23/2026 10:43:08 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Carbon Copy Events Status Timestamp Jessica Bradshaw bradshaj@d93.k12.id.us Assistant to Director of Maint & Facilities Security Level: Email, Account Authentication (None) Sent: 2/23/2026 10:42:45 AM Viewed: 2/23/2026 10:47:57 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 2/10/2026 10:16:55 AM Envelope Updated Security Checked 2/10/2026 10:17:51 AM Certified Delivered Security Checked 2/23/2026 10:42:30 AM Signing Complete Security Checked 2/23/2026 10:42:41 AM Completed Security Checked 2/23/2026 10:42:45 AM Payment Events Status Timestamps Document A133®–2019 Exhibit A Guaranteed Maximum Price Amendment AIA Document A133 –2019 Exhibit A.Copyright ©1991,2003,2009,and 2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:31:27 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973ba7f7d255a8916e975bf) 1 ADDITIONS AND DELETIONS: The author of this document may have revised the text of the original AIA standard form.An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed.A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text. This document has important legal consequences.Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201™–2017, General Conditions of the Contract for Construction,is adopted in this document by reference.Do not use with other general conditions unless this document is modified. This Amendment dated the Fifteenth day of July in the year Two Thousand Twenty- Five,is incorporated into the accompanying AIA Document A133™–2019,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the Twenty-eighth day of January in the year Two Thousand Twenty-Five (the “Agreement”) (In words,indicate day,month,and year.) for the following PROJECT: (Name and address or location) D93 Remodels Bonneville High School Remodel -Phase 2 3165 East Iona Road Idaho Falls,ID 83401 THE OWNER: (Name,legal status,and address) Bonneville Joint School District No.93 3497 N.Ammon Road Idaho Falls,ID 83401 THE CONSTRUCTION MANAGER: (Name,legal status,and address) Headwaters Construction Company 639 West 9500 South,Ste 1 Victor,ID 83455 TABLE OF ARTICLES A.1     GUARANTEED MAXIMUM PRICE A.2     DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3     INFORMATION UPON WHICH AMENDMENT IS BASED A.4     CONSTRUCTION MANAGER’S CONSULTANTS,CONTRACTORS,DESIGN PROFESSIONALS,AND SUPPLIERS ARTICLE A.1   GUARANTEED MAXIMUM PRICE §A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed.The Contract Sum consists of the Construction Manager’s Fee plus the Cost of the Work,as that term is defined in Article 6 of the Agreement. §A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed  Seven Million One Hundred and Forty-Nine Thousand Seven Hundred Twenty-Nine Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit A.Copyright ©1991,2003,2009,and 2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:31:27 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973ba7f7d255a8916e975bf) 2 Dollars and Zero Cents ($7,149,729.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. §A.1.1.2 Itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories,including allowances;the Construction Manager’s contingency;alternates; the Construction Manager’s Fee;and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) The itemized statement of the Guaranteed Maximum Price is included in Exhibit A-1 attached hereto and titled, "Bonneville High School Remodel Phase 2 ,"Section 01,dated 13 January 2026. §A.1.1.3 The Construction Manager’s Fee is set forth in Section 6.1.2 of the Agreement. §A.1.1.4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. §A.1.1.5 Alternates §A.1.1.5.1 Alternates,if any,included in the Guaranteed Maximum Price: Item Price §A.1.1.5.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Exhibit A.Upon acceptance,the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance See Exhibit A-1,Section 02 §A.1.1.6 Unit prices,if any: (Identify the item and state the unit price and quantity limitations,if any,to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) See Exhibit A-1,Section 02 ARTICLE A.2   DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes.)      [   ]     The date of execution of this Amendment.      [X ]     Established as follows:     (Insert a date or a means to determine the date of commencement of the Work.) The date of Commencement of Work shall be established in a Notice to Proceed issued by the Owner.  If a date of commencement of the Work is not selected,then the date of commencement shall be the date of execution of this Amendment. §A.2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments,allotted in the Contract Documents for Substantial Completion of the Work.The Contract Time shall be measured from the date of commencement of the Work. §A.2.3 Substantial Completion §A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information.) Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit A.Copyright ©1991,2003,2009,and 2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:31:27 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973ba7f7d255a8916e975bf) 3      [X ]     Not later than Four Hundred Forty-Eight (448 )calendar days from the date of commencement of the Work.      [   ]     By the following date: §A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work are to be completed prior to Substantial Completion of the entire Work,the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date §A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3,liquidated damages,if any,shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3   INFORMATION UPON WHICH AMENDMENT IS BASED §A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: §A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages §A.3.1.2 The following Specifications: (Either list the Specifications here,or refer to an exhibit attached to this Amendment.) Section Title Date Pages See Exhibit A-1, Section 03 §A.3.1.3 The following Drawings: (Either list the Drawings here,or refer to an exhibit attached to this Amendment.) Number Title Date See Exhibit A-1,Section 03 §A.3.1.4 The Sustainability Plan,if any: (If the Owner identified a Sustainable Objective in the Owner’s Criteria,identify the document or documents that comprise the Sustainability Plan by title,date and number of pages,and include other identifying information.The Sustainability Plan identifies and describes the Sustainable Objective;the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures;the Owner’s and Construction Manager’s roles and responsibilities associated with achieving the Sustainable Measures;the specific details about design reviews,testing or metrics to verify achievement of each Sustainable Measure;and the Sustainability Documentation required for the Project,as those terms are defined in Exhibit C to the Agreement.) Title Date Pages Not Applicable Other identifying information: §A.3.1.5 Allowances,if any,included in the Guaranteed Maximum Price: (Identify each allowance.) Item Price Not Applicable Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit A.Copyright ©1991,2003,2009,and 2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 09:12:11 MST on 01/26/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973ba7f7d255a8916e975bf) 4 §A.3.1.6 Assumptions and clarifications,if any,upon which the Guaranteed Maximum Price is based: (Identify each assumption and clarification.) Assumption and clarifications are described in Exhibit A-1,attached hereto and titled,"Bonneville High School Remodel Phase 2,"Section 02,dated 13 January 202.  §A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here,or refer to an exhibit attached to this Amendment.) See Exhibit A-1,Section 02 &03  ARTICLE A.4   CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS §A.4.1 The Construction Manager shall retain the consultants,contractors,design professionals,and suppliers,identified below: (List name,discipline,address,and other information.) None Included  This Amendment to the Agreement entered into as of the day and year first written above. /s1/ OWNER (Signature) (Printed name and title) /s2/ CONSTRUCTION MANAGER (Signature) (Printed name and title) Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C 900 Jet Stream Drive, Rexburg, Idaho 83440 | 866.496.9868 | HeadwatersCC.com PROPOSAL January 13, 2026 John Pymm/Cody Jackson Bonneville School District #93 2455 Virlow Street Idaho Falls, ID 83401 Project: Bonneville Phase 2 Remodel On behalf of Headwaters Construction Company, I am pleased to submit our GMP Proposal for the Bonneville High School Phase 2 Remodel for the following amount. Add alternate 1 and 2 have not been accepted and will not be part of the GMP. Total Guaranteed Maximum Price $7,149,729.00 Add Alternate #1 – Condensers (not included) $357,162.00 Add Alternate #2 – CAT 6A (not included) $16,277.00 Enclosed you will find the GMP Cost Summary, Basis of Estimate, construction Schedule and an Enumeration of Documents. We look forward to a successful and enjoyable project together. Thank you for this opportunity. Please do not hesitate to contact me directly with any questions and/or comments. Respectfully submitted, Domonick Bell Preconstruction Manager DBell@headwaterscc.com cc: Logan Bingham – Project Executive Kent Carson – Project Manager Brennon Baker– Preconstruction Director Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal Metal fabrication 1 3 A-wing area (Area 21 5 6 7 8 √+$33,300 New Bathrooms NA 3 All other areas √+$31,920 Bid Package/Scope of work Incl Roof patching Incl Solar tub lighting bridging Incl Sky light supports Incl Cut out decking Incl Cut out decking and bridging for RTU Cut out decking and bridging for CU-1 See alternates 3 Additional Patching on the roof 50 SF $35.00 O $3,250 1 Additional steel angle if needed 150 LF $10.00 O $2,500 Misc roof patching Incl 3 Boilers will need to be removed. We will need to patch in around the flue vents because the new flues are a lot smaller 100 SF $35.00 O $4,500 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Metal Fabrication 19 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Manufab 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE TOTAL $0 $75,470 Manufab $75,470 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 11 $0 √$126,398 Incl √$181,745 √$93,578 1 A-wing area (Area 21 Incl √$53,078 Incl Incl 2 New Bathrooms Incl √$8,047 Incl Incl 3 All other areas Incl √$3,875 Incl Incl Scope Package/Bid form R1 Incl Incl Incl Incl A-wing area (Area 21 Incl Incl Incl Incl Flooring/stair treads and mastic Incl Incl Incl Incl Bathrooms - tile, doors, walls, substrate, fixtures, bathroom Incl Incl Incl Incl Ceiling tile Incl Incl Incl Incl Doors Incl Incl Incl Incl CMU Incl Incl Incl Incl Aditorium Incl Incl Incl Incl Acoustic sound panels Incl Incl Incl Incl auditorium seating Incl Incl Incl Incl Flooring Incl Incl Incl Incl Haul off of demo material Incl Incl Incl Incl 3 Other areas misc demolition area A 1,500 SF $5.00 O $14,600 O $16,600 O $14,600 O $14,600 3 Remove house keeping pads O $5,000 O $5,000 O $5,000 O $5,000 Subcontractor Trade Contingency Recommended Sub-Contractor:Accurate Concrete Cutting Bid Price: Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Staton Company Selective Building Demolition Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate A-Core Accurate Concrete Cutting TID Inc. 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $145,998 $86,600 COMPLETE $201,345 $113,178 Selective Building Demolition $86,600 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 18 $0 1 A-wing area (Area 21 √$12,646 2 New Bathrooms √$2,500 All other areas NA Scope Package/Bid form NA Interior insulation Incl Sprayfoam insulation Incl 1 Misc insulation if needed O $2,500 Subcontractor Trade Contingency Recommended Sub-Contractor: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Date: Building Insulation 30 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate BDI 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE TOTAL $0 $17,646 Building Insulation BDI $17,646 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 22 $0 Incl √$903,185 1 A-wing area (Area 21 √$10,000 Incl New Bathrooms Incl Incl 3 All other areas √$349,719 Incl Scope Package/Bid form Demolition Incl Incl roof membrane Incl Incl underlayment materials Incl Incl New roof membrane Incl Incl Additional insulation to meet R-30 Incl Incl Roof patching and repair Incl Incl Misc Roof Pataching Incl Incl 3 Boilers will need to be removed. We will need to patch in around the flue vents because the new flues are a lot smaller than 750 SF $25.00 O $13,220 O $13,220 Subcontractor Trade Contingency Recommended Sub-Contractor: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Date:Areas of existing roof that will need patched - Area A, F (will need curbing for RTU) Roofing Systems 31 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Robison Roofing Roof Top Solutions 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE TOTAL $372,939 $916,405 Roofing Systems Robison Roofing $372,939 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 6 $0 Incl Incl Incl 1 Bid package # 33 57 EA $1,850.00 $159,864 √$168,920 √$139,763 Materials and Equipment Incl Incl Incl Install Incl Incl Incl Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Tubular Skylights Ducting 33 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate B&B Alder Sales View Point 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $159,864 $168,920 $139,763 Tubular Skylights Ducting View Point $139,763 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 12 $0 √Incl Incl Incl 1 A-wing area (Area 21 √$172,670 √$122,689 √$158,000 New Bathrooms NA NA NA All other areas NA NA NA Scope Package/Bid form Incl Incl Incl Storefronts Incl Incl Incl Glazing Incl Incl Incl Security Film Incl Incl Incl Glazing for wood doors Incl Incl Incl Storefront Hardware Incl Incl Incl 1 Mis flashing/touch up O $2,500 O $2,500 O $2,500 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Exterior Entrances and Storefronts 37 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Precision Glass Cherry Glass Nu-Vu 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $175,170 $125,189 $160,500 Exterior Entrances and Storefronts Cherry Glass $125,189 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 EIFS 5 6 7 8 Incl 1 Insulation & A-wing area (Area 21 $4 $0 √$6,300 New Bathrooms NA All other areas NA Scope Package/bid Form Incl EIFS Incl weather Barrier Incl 1 Misc flashing O $1,000 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Exterior Insulation & Finish Systems 38 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate DCR 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE TOTAL $0 $7,300 DCR $7,300 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 22,902 SF $5.00 11 $0 Incl Incl Incl 1 A-wing area (Area 21 √$178,995 √$84,560 √$105,500 New Bathrooms ` Incl Incl Incl All other areas Incl Incl Incl Scope Package/bid Form Incl Incl Incl New ceiling grid Incl Incl Incl 3 Misc. ceiling tile replacement 3,000 SF $6.00 O $19,000 O $19,000 O $19,000 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Acoustical Ceilings 48 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Hatch KJ Acoustics Idaho Interiors 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $197,995 $103,560 $124,500 Acoustical Ceilings KJ Acoustics $103,560 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 18 $0 √$308,590 Incl $246,437 1 A-wing area (Area 21 Incl √$223,416 Incl 2 New Bathrooms Incl √$13,295 Incl 3 All other areas Incl √$7,500 Incl Scope Package/bid Form Incl Incl Incl Metal stud framing Incl Incl Incl Skylights Incl Incl Incl Hard lid ceilings Incl Incl Incl Pony Wall Incl Incl Incl Drywall Incl Incl Incl 3 Auditorium patching and repair Incl Incl Incl 3 Misc drywall patching at other areas 4,000 SF $3.00 O $10,500 O $10,500 O $10,500 1 Misc blocking O $8,222 O $8,222 O $8,222 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Metal Stud Framing & Drywall Assemblies 49 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Hatch All Phase Construction Idaho Interiors 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $327,312 $262,933 $265,159 Metal Stud Framing & Drywall Assemblies All Phase Construction $262,933 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 √$164,260 √$154,000 √$166,858 Incl √$160,000 1 A-wing area (Area 21 Incl Incl Incl √$98,923 Incl New Bathrooms NA NA NA NA NA 3 All other areas Incl Incl Incl √$6,200 Incl Scope Package/bid Form Incl Incl Incl Incl Incl Resilient flooring Incl Incl Incl Incl Incl Carpet tile Incl Incl Incl Incl Incl resilient Base Incl Incl Incl Incl Incl Transitions Incl Incl Incl Incl Incl 1 Additional floor prep 18,000 SF $0.50 $9,000 O $10,200 O $10,200 O $10,200 O $10,200 O $10,200 1 Floor removal O $11,755 O $11,755 O $11,755 √+$11,755.22 O $11,755 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Patriot Flooring Wall to Wall Flooring 50 Bonneville High School Phase 2 Carpet Direct Hart Flooring CP Build 224120-V5 GMP COMPLETE1//13/2026 COMPLETE COMPLETE TOTAL $186,215 $175,955 $127,078 $181,955 COMPLETE COMPLETE $188,813 Flooring Patriot Flooring $127,078 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 9 $0 Incl Incl Incl Incl 1 A-wing area (Area 21 √$140,726 √$150,366 √$220,580 $155,844 2 New Bathrooms 185 SF $450.00 $83,250 √$5,810 Incl Incl Incl All other areas 459 SF $150.00 $68,850 NA NA NA NA Scope Package/bid Form Incl Incl Incl Incl work Incl Incl Incl Incl Cabinets w/ glass Incl Incl Incl Incl Science stations Incl Incl Incl Incl Adjustable shelving Incl Incl Incl Incl Tall wall cabinets Incl Incl Incl Incl Countertops Incl Incl Incl Incl Epoxy resin countertops Incl Incl Incl Incl Solid surface countertops Incl Incl Incl Incl backsplashes Incl Incl Incl Incl solid surface sill for windows Incl Incl Incl Incl Install display cases Incl Incl Incl Incl Install teacher stations Incl Incl Incl Incl 1 Misc touch ups O $2,500 O $2,500 O $2,500 O $2,500 1 Misc bracket supports O $2,500 O $2,500 O $2,500 O $2,500 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Johnson Bro Cabinets and countertops 51 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Blue Mountain Jorgenson Pacific Cabinets Inc 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $151,537 $155,366 $160,844 COMPLETE $225,580 Cabinets and countertops Blue Mountain $151,537 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 9 $0 1 A-wing area (Area 21 √$60,000 2 New Bathrooms √$2,500 3 All other areas √$30,000 Scope Package/bid Form A-wing area interior painting Incl Auditorium Incl 1 Paint touch-up 3,000 SF $3.50 O $12,500 Subcontractor Trade Contingency Recommended Sub-Contractor: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Date: Painting 52 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Aspen Painting 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE TOTAL $0 $105,000 Painting Aspen Painting Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 SF 13 $0 √$106,789 Incl 1 A-wing area (Area 21 Incl √$47,310 2 New Bathrooms Incl √$38,660 3 All other areas NA NA Scope Package/bid Form Incl Incl A-wing corridor area Incl Incl Bathrooms walls and floors Incl Incl 1 Additional floor prep O $2,111 O $2,111 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Tiling 53 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate CP Build Timeless Tile 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $108,900 $88,081 Tiling Timeless Tile $88,081 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 9 $0 Incl A-wing area (Area 21 NA New Bathrooms NA 3 All other areas √$16,265 Scope Package/bid Form Incl Auditorium area Incl 3 Floor prep/protection O $2,500 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Polished Concrete 54 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Consurco 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE TOTAL $0 $18,765 Polished Concrete Consurco $18,765 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 9 $0 Incl A-wing area (Area 21 704 SF $56.82 $40,000 NA New Bathrooms NA 3 All other areas √$25,400 Scope Package/bid Form Incl Auditorium Incl 3 Misc Patching/Repair O $3,221 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Acoustical Treatments 55 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Idaho Interiors 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE TOTAL $0 $28,621 Acoustical Treatments Idaho Interiors $28,621 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 8 $0 Incl Incl 1 A-wing area (Area 21)√$35,345 √$34,556 New Bathrooms Incl Incl All other areas Incl Incl Scope Package/bid Form Incl Incl 1 Misc Adjustments /touch ups O $2,111 O $2,111 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Visual Display Units & Display Cases 67 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate SBI ADP Lemco 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $37,456 $36,667 Visual Display Units & Display Cases ADP Lemco $36,667 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 9 $0 Incl 1 A-wing area (Area 21)$2,984 New Bathrooms Incl All other areas NA Scope Package/bid Form Incl Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Interior Signage 68 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Landmark Signs 224120-V5 GMP Email: 1//13/2026 COMPLETE COMPLETE TOTAL $0 $2,984 Interior Signage Landmark Signs $2,984 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 10 $0 √$34,200 √Incl Incl Bathrooms Incl Incl 1 A-wing area (Area 21)Incl √$1,970 √$500 2 New Bathrooms Incl √$22,155 √$23,191 All other areas NA NA NA Scope Package/bid Form Incl Incl Incl Bathrooms Incl Incl Incl Wall mirror w/ stainless steel frame Inl Inl Incl Toilet partition Incl Incl Incl Grab bars Incl Incl Incl Bathroom accessories Incl Incl Incl Install owner provided items Incl Incl Incl 1 Misc owner install items O $2,432 O $2,432 O $2,432 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Toilet, Bath & Laundry Accessories 72 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Cannon Sales SBI Contractors Highland Specialties 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $36,632 $26,557 $26,123 Toilet, Bath & Laundry Accessories Highland Specialties $26,123 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 8 $0 Incl Incl 1 A-wing area (Area 21 √$174,539 √$73,986 √$74,995 2 New Bathrooms Incl Incl Incl 3 All other areas NA NA NA Bid Package/Scope of work Incl Incl Incl Bid Package Incl Incl Incl 1 Fire head readjustments/Misc. access panels O $3,882 O $3,882 O $3,882 Subcontractor Trade Contingency Recommended Sub-Contractor: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Date: Prefered Fire Protection Fire Suppression Systems 91 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate 3D Fire Protection Phoenix Fire 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE TOTAL $0 $178,421 $78,877 COMPLETE $77,868 Fire Suppression Systems Phoenix Fire $77,868 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 14 $0 $4,013,000 √$3,231,600 Incl 1 A-wing area (Area 21 Incl Incl √$538,300 2 New Bathrooms Incl Incl √$7,800 3 All other areas Incl Incl √$1,810,210 Scope Package HVAC R2 Incl Incl Incl Demolition of existing equipment Incl Incl Incl HVAC Equipment Incl Incl Incl heat pumps Incl Incl Incl 3 water source heat pumps Incl Incl Incl 3 hose kits pumps furnish only Incl Incl √+$22,125 Air handling Incl Incl Incl Split system Incl Incl Incl Air terminal Incl Incl Incl DOAS Incl Incl Incl Penthouse Incl Incl Incl Cabinet unit heaters Incl Incl Incl Furnish and install flues for boilers Incl Incl Incl Harris Controls Incl Incl Incl Air balancing Incl Incl Incl 3 Hydronic and HVAC Misc. Coordination O $16,551 O $16,551 O $16,551 3 Misc. Access panels/filters $10,725 Θ $10,725 Θ $10,725 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: HVAC Systems 93 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Hobson Fabricating JM Mechanical Lewis 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $4,040,276 $3,258,876 $2,405,711 HVAC Systems Lewis $2,405,711 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 19 $0 √$567,396 √$643,005 √$649,871 $458,350 $545,040 Incl 1 A-wing area (Area 21 Incl Incl Incl Incl Incl √$259,431 2 New Bathrooms Incl Incl Incl Incl Incl √$5,772 3 All other areas Incl Incl Incl Incl Incl √$193,527 Scope of work R2 Incl Incl Incl Incl Incl Incl Demoliton Incl Incl Incl Incl Incl Incl 3 Auditorium lighting/ Theatre lighting Controls additional coordination $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 New lighting Incl Incl Incl Incl Incl Incl Low voltage Incl Incl Incl Incl Incl Incl Division 27 Communication Incl Incl Incl Incl Incl Incl Division 28 Fire alarm Incl Incl Incl Incl Incl Incl Permits Incl Incl Incl Incl Incl Incl 1 Electrical access panels O $5,444 O $5,444 O $5,444 O $5,444 O $5,444 O $5,444 3 Additional electrical demolition/Prep O $7,443 O $7,443 O $7,443 O $7,443 O $7,443 O $7,443 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Cutting Edge Electric Precision Electric Packer Electric Electrical 94 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Nelson DC Mountain Valley 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $585,283 $660,892 $562,927 $476,617 LATE COMPLETE COMPLETE $667,758 LATE $476,237 Electrical Packer Electric $476,617 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C WBS Section Description Qty Unit Unit Cost Subtotal 2 3 4 5 6 7 8 14 $0 Incl √$1,440,000 √$1,569,300 1 A-wing area (Area 21 √$283,748 Incl Incl 2 New Bathrooms √$41,466 Incl Incl 3 All other areas √$993,224 Incl Incl Scope of work R4 Incl Incl Incl Hydronic Equipment Incl Incl Incl Demolition Incl Incl Incl Boilers Incl Incl Incl Pumps Incl Incl Incl unit heater hydronic Incl Incl Incl panel radiator Incl Incl Incl expansion tank Incl Incl Incl air dirt seperator Incl Incl Incl New water, sewer, and gas lines Incl Incl Incl furnish by HVAC Hose Kits needs to be installed Incl install Incl install Incl install Flue for the boilers furnish and install See HVAC See HVAC See HVAC 3 Additional coordination between HVAC and Hydronic scops Θ $16,318 Θ $16,318 Θ $16,318 Subcontractor Trade Contingency Recommended Sub-Contractor: Bid Price: Date:1/13/2026 Why: Reason for not obtaining three bids? Reason for marking Subcontractor "Incomplete" Owner Signature: Print Name: Date: Hydronic Systems 95 Bonneville High School Phase 2 Contact Name: Phone: Detailed Estimate Upstream Plumbing Evans Plumbing Bingham Mechanical 224120-V5 GMP Email: COMPLETE1//13/2026 COMPLETE COMPLETE COMPLETE TOTAL $0 $1,334,756 $1,456,318 $1,585,618 Hydronic Systems Upstream Plumbing $1,334,756 Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C Document A133®–2019 Exhibit B Insurance and Bonds AIA Document A133 –2019 Exhibit B.Copyright ©2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:34:47 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973bedd6a6b3f8154ebff62) 1 ADDITIONS AND DELETIONS: The author of this document may have revised the text of the original AIA standard form.An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed.A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text. This document has important legal consequences.Consultation with an attorney is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Document A201™–2017,General Conditions of the Contract for Construction.Article 11 of A201™–2017 contains additional insurance provisions. This Insurance and Bonds Exhibit is part of the Agreement,between the Owner and the Construction Manager,dated the Twenty-third day of January in the year Two Thousand Twenty-Six (In words,indicate day,month and year.) for the following PROJECT: (Name and location or address) D93 Remodels Bonneville High School Remodel Phase 2 3165 East Iona Road Idaho Falls,ID 83401 THE OWNER: (Name,legal status,and address) Bonneville Joint School District No.93 3497 N.Ammon Road Idaho Falls,ID 83401 THE CONSTRUCTION MANAGER: (Name,legal status,and address) Headwaters Construction Company 639 W 9500 S,Ste 1 Victor,ID 83455 TABLE OF ARTICLES B.1     GENERAL B.2     OWNER’S INSURANCE B.3     CONSTRUCTION MANAGER’S INSURANCE AND BONDS B.4     SPECIAL TERMS AND CONDITIONS ARTICLE B.1   GENERAL The Owner and Construction Manager shall purchase and maintain insurance,and provide bonds,as set forth in this Exhibit.As used in this Exhibit,the term General Conditions refers to AIA Document A201™–2017,General Conditions of the Contract for Construction. ARTICLE B.2   OWNER’S INSURANCE §B.2.1 General Prior to commencement of the Work,the Owner shall secure the insurance,and provide evidence of the coverage,required under this Article B.2 and,upon the Construction Manager’s request,provide a copy of the property insurance policy or policies required by Section B.2.3.The copy of the policy or policies provided shall contain all applicable conditions,definitions,exclusions,and endorsements. §B.2.2 Liability Insurance Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit B.Copyright ©2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:34:47 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973bedd6a6b3f8154ebff62) 2 The Owner shall be responsible for purchasing and maintaining the Owner’s usual general liability insurance. §B.2.3 Required Property Insurance §B.2.3.1 Unless this obligation is placed on the Construction Manager pursuant to Section B.3.3.2.1,the Owner shall purchase and maintain,from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located,property insurance written on a builder's risk “all-risks”completed value or equivalent policy form and sufficient to cover the total value of the entire Project on a replacement cost basis.The Owner’s property insurance coverage shall be no less than the amount of the initial Contract Sum,plus the value of subsequent Modifications and labor performed and materials or equipment supplied by others.The property insurance shall be maintained until Substantial Completion and thereafter as provided in Section B.2.3.1.3,unless otherwise provided in the Contract Documents or otherwise agreed in writing by the parties to this Agreement.This insurance shall include the interests of the Owner,Construction Manager,Subcontractors,and Sub-subcontractors in the Project as insureds.This insurance shall include the interests of mortgagees as loss payees. §B.2.3.1.1 Causes of Loss.The insurance required by this Section B.2.3.1 shall provide coverage for direct physical loss or damage,and shall not exclude the risks of fire,explosion,theft,vandalism,malicious mischief,collapse,earthquake, flood,or windstorm.The insurance shall also provide coverage for ensuing loss or resulting damage from error,omission, or deficiency in construction methods,design,specifications,workmanship,or materials.Sub-limits,if any,are as follows: (Indicate below the cause of loss and any applicable sub-limit.) Cause of Loss Sub-Limit §B.2.3.1.2 Specific Required Coverages.The insurance required by this Section B.2.3.1 shall provide coverage for loss or damage to falsework and other temporary structures,and to building systems from testing and startup.The insurance shall also cover debris removal,including demolition occasioned by enforcement of any applicable legal requirements,and reasonable compensation for the Architect’s and Construction Manager’s services and expenses required as a result of such insured loss,including claim preparation expenses.Sub-limits,if any,are as follows: (Indicate below type of coverage and any applicable sub-limit for specific required coverages.) Coverage Sub-Limit §B.2.3.1.3 Unless the parties agree otherwise,upon Substantial Completion,the Owner shall continue the insurance required by Section B.2.3.1 or,if necessary,replace the insurance policy required under Section B.2.3.1 with property insurance written for the total value of the Project that shall remain in effect until expiration of the period for correction of the Work set forth in Section 12.2.2 of the General Conditions. §B.2.3.1.4 Deductibles and Self-Insured Retentions.If the insurance required by this Section B.2.3 is subject to deductibles or self-insured retentions,the Owner shall be responsible for all loss not covered because of such deductibles or retentions. §B.2.3.2 Occupancy or Use Prior to Substantial Completion.The Owner’s occupancy or use of any completed or partially completed portion of the Work prior to Substantial Completion shall not commence until the insurance company or companies providing the insurance under Section B.2.3.1 have consented in writing to the continuance of coverage.The Owner and the Construction Manager shall take no action with respect to partial occupancy or use that would cause cancellation,lapse,or reduction of insurance,unless they agree otherwise in writing. §B.2.3.3 Insurance for Existing Structures If the Work involves remodeling an existing structure or constructing an addition to an existing structure,the Owner shall purchase and maintain,until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions,“all-risks”property insurance,on a replacement cost basis,protecting the existing structure against direct physical loss or damage from the causes of loss identified in Section B.2.3.1,notwithstanding the undertaking of the Work.The Owner shall be responsible for all co-insurance penalties. §B.2.4 Optional Extended Property Insurance. The Owner shall purchase and maintain the insurance selected and described below. (Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es)next to the Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit B.Copyright ©2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:34:47 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973bedd6a6b3f8154ebff62) 3 description(s)of selected insurance.For each type of insurance selected,indicate applicable limits of coverage or other conditions in the fill point below the selected item.) [   ]     §B.2.4.1 Loss of Use,Business Interruption,and Delay in Completion Insurance,to reimburse the Owner for loss of use of the Owner’s property,or the inability to conduct normal operations due to a covered cause of loss. [   ]     §B.2.4.2 Ordinance or Law Insurance,for the reasonable and necessary costs to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition,construction,repair, replacement or use of the Project. [   ]     §B.2.4.3 Expediting Cost Insurance,for the reasonable and necessary costs for the temporary repair of damage to insured property,and to expedite the permanent repair or replacement of the damaged property. [   ]     §B.2.4.4 Extra Expense Insurance,to provide reimbursement of the reasonable and necessary excess costs incurred during the period of restoration or repair of the damaged property that are over and above the total costs that would normally have been incurred during the same period of time had no loss or damage occurred. [   ]     §B.2.4.5 Civil Authority Insurance,for losses or costs arising from an order of a civil authority prohibiting access to the Project,provided such order is the direct result of physical damage covered under the required property insurance. [   ]     §B.2.4.6 Ingress/Egress Insurance,for loss due to the necessary interruption of the insured’s business due to physical prevention of ingress to,or egress from,the Project as a direct result of physical damage. [   ]     §B.2.4.7 Soft Costs Insurance,to reimburse the Owner for costs due to the delay of completion of the Work,arising out of physical loss or damage covered by the required property insurance:including construction loan fees;leasing and marketing expenses;additional fees,including those of architects, engineers,consultants,attorneys and accountants,needed for the completion of the construction,repairs,or reconstruction;and carrying costs such as property taxes,building permits,additional interest on loans, realty taxes,and insurance premiums over and above normal expenses. §B.2.5 Other Optional Insurance. The Owner shall purchase and maintain the insurance selected below. (Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es)next to the description(s)of selected insurance.) [   ]     §B.2.5.1 Cyber Security Insurance for loss to the Owner due to data security and privacy breach,including costs of investigating a potential or actual breach of confidential or private information. (Indicate applicable limits of coverage or other conditions in the fill point below.) [X ]     §B.2.5.2 Other Insurance (List below any other insurance coverage to be provided by the Owner and any applicable limits.) Coverage Limits Builder's Risk Insurance Total GMP Amount  ARTICLE B.3   CONSTRUCTION MANAGER’S INSURANCE AND BONDS §B.3.1 General §B.3.1.1 Certificates of Insurance.The Construction Manager shall provide certificates of insurance acceptable to the Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit B.Copyright ©2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:34:47 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973bedd6a6b3f8154ebff62) 4 Owner evidencing compliance with the requirements in this Article B.3 at the following times:(1)prior to commencement of the Work;(2)upon renewal or replacement of each required policy of insurance;and (3)upon the Owner’s written request.An additional certificate evidencing continuation of commercial liability coverage,including coverage for completed operations,shall be submitted with the final Application for Payment and thereafter upon renewal or replacement of such coverage until the expiration of the periods required by Section B.3.2.1 and Section B.3.3.1.The certificates will show the Owner as an additional insured on the Construction Manager’s Commercial General Liability and excess or umbrella liability policy or policies. §B.3.1.2 Deductibles and Self-Insured Retentions.The Construction Manager shall disclose to the Owner any deductible or self-insured retentions applicable to any insurance required to be provided by the Construction Manager. §B.3.1.3 Additional Insured Obligations.To the fullest extent permitted by law,the Construction Manager shall cause the commercial general liability coverage to include (1)the Owner,the Architect,and the Architect’s consultants as additional insureds for claims caused in whole or in part by the Construction Manager’s negligent acts or omissions during the Construction Manager’s operations;and (2)the Owner as an additional insured for claims caused in whole or in part by the Construction Manager’s negligent acts or omissions for which loss occurs during completed operations.The additional insured coverage shall be primary and non-contributory to any of the Owner’s general liability insurance policies and shall apply to both ongoing and completed operations.To the extent commercially available,the additional insured coverage shall be no less than that provided by Insurance Services Office,Inc.(ISO)forms CG 20 10 07 04,CG 20 37 07 04,and,with respect to the Architect and the Architect’s consultants,CG 20 32 07 04. §B.3.2 Construction Manager’s Required Insurance Coverage §B.3.2.1 The Construction Manager shall purchase and maintain the following types and limits of insurance from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located.The Construction Manager shall maintain the required insurance until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions,unless a different duration is stated below: (If the Construction Manager is required to maintain insurance for a duration other than the expiration of the period for correction of Work,state the duration.) §B.3.2.2 Commercial General Liability §B.3.2.2.1 Commercial General Liability insurance for the Project written on an occurrence form with policy limits of not less than One Million Dollars and Zero Cents ($1,000,000.00 )each occurrence,Two Million Dollars and Zero Cents ($ 2,000,000.00 )general aggregate,and Two Million Dollars and Zero Cents ($2,000,000.00 )aggregate for products- completed operations hazard,providing coverage for claims including .1     damages because of bodily injury,sickness or disease,including occupational sickness or disease,and death of any person; .2     personal injury and advertising injury; .3     damages because of physical damage to or destruction of tangible property,including the loss of use of such property; .4     bodily injury or property damage arising out of completed operations;and .5     the Construction Manager’s indemnity obligations under Section 3.18 of the General Conditions. §B.3.2.2.2 The Construction Manager’s Commercial General Liability policy under this Section B.3.2.2 shall not contain an exclusion or restriction of coverage for the following: .1     Claims by one insured against another insured,if the exclusion or restriction is based solely on the fact that the claimant is an insured,and there would otherwise be coverage for the claim. .2     Claims for property damage to the Construction Manager’s Work arising out of the products-completed operations hazard where the damaged Work or the Work out of which the damage arises was performed by a Subcontractor. .3     Claims for bodily injury other than to employees of the insured. .4     Claims for indemnity under Section 3.18 of the General Conditions arising out of injury to employees of the insured. .5     Claims or loss excluded under a prior work endorsement or other similar exclusionary language. .6     Claims or loss due to physical damage under a prior injury endorsement or similar exclusionary language. .7     Claims related to residential,multi-family,or other habitational projects,if the Work is to be performed on such a project. .8     Claims related to roofing,if the Work involves roofing. .9     Claims related to exterior insulation finish systems (EIFS),synthetic stucco or similar exterior coatings or Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit B.Copyright ©2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:34:47 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973bedd6a6b3f8154ebff62) 5 surfaces,if the Work involves such coatings or surfaces. .10    Claims related to earth subsidence or movement,where the Work involves such hazards. .11    Claims related to explosion,collapse and underground hazards,where the Work involves such hazards. §B.3.2.3 Automobile Liability covering vehicles owned,and non-owned vehicles used,by the Construction Manager, with policy limits of not less than One Million Dollars and Zero Cents ($1,000,000.00 )per accident,for bodily injury, death of any person,and property damage arising out of the ownership,maintenance and use of those motor vehicles along with any other statutorily required automobile coverage. §B.3.2.4 The Construction Manager may achieve the required limits and coverage for Commercial General Liability and Automobile Liability through a combination of primary and excess or umbrella liability insurance,provided such primary and excess or umbrella insurance policies result in the same or greater coverage as the coverages required under Section B.3.2.2 and B.3.2.3,and in no event shall any excess or umbrella liability insurance provide narrower coverage than the primary policy.The excess policy shall not require the exhaustion of the underlying limits only through the actual payment by the underlying insurers. §B.3.2.5 Workers’Compensation at statutory limits. §B.3.2.6 Employers’Liability with policy limits not less than One Million Dollars and Zero Cents ($1,000,000.00 )each accident,One Million Dollars and Zero Cents ($1,000,000.00 )each employee,and One Million Dollars and Zero Cents ($1,000,000.00 )policy limit. §B.3.2.7 Jones Act,and the Longshore &Harbor Workers’Compensation Act,as required,if the Work involves hazards arising from work on or near navigable waterways,including vessels and docks §B.3.2.8 If the Construction Manager is required to furnish professional services as part of the Work,the Construction Manager shall procure Professional Liability insurance covering performance of the professional services,with policy limits of not less than One Million Dollars and Zero Cents ($1,000,000.00 )per claim and One Million Dollars and Zero Cents ($1,000,000.00 )in the aggregate. §B.3.2.9 If the Work involves the transport,dissemination,use,or release of pollutants,the Construction Manager shall procure Pollution Liability insurance,with policy limits of not less than ($)per claim and ($)in the aggregate. §B.3.2.10 Coverage under Sections B.3.2.8 and B.3.2.9 may be procured through a Combined Professional Liability and Pollution Liability insurance policy,with combined policy limits of not less than ($)per claim and ($)in the aggregate. §B.3.2.11 Insurance for maritime liability risks associated with the operation of a vessel,if the Work requires such activities,with policy limits of not less than ($)per claim and ($)in the aggregate. §B.3.2.12 Insurance for the use or operation of manned or unmanned aircraft,if the Work requires such activities,with policy limits of not less than ($)per claim and ($)in the aggregate. §B.3.3 Construction Manager’s Other Insurance Coverage §B.3.3.1 Insurance selected and described in this Section B.3.3 shall be purchased from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located.The Construction Manager shall maintain the required insurance until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions,unless a different duration is stated below: (If the Construction Manager is required to maintain any of the types of insurance selected below for a duration other than the expiration of the period for correction of Work,state the duration.) The Construction Manager shall maintain Completed Operations Insurance for a minimum of six (6)years,or as allowed by the statute of repose for the State of Idaho at the time of the claim,whichever is greater.  §B.3.3.2 The Construction Manager shall purchase and maintain the following types and limits of insurance in accordance with Section B.3.3.1. (Select the types of insurance the Construction Manager is required to purchase and maintain by placing an X in the box(es)next to the description(s)of selected insurance.Where policy limits are provided,include the policy limit in the appropriate fill point.) Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C AIA Document A133 –2019 Exhibit B.Copyright ©2019.All rights reserved.“The American Institute of Architects,”“American Institute of Architects,”“AIA,”the AIA Logo,and “AIA Contract Documents”are trademarks of The American Institute of Architects.This document was produced at 11:34:47 MST on 01/23/2026 under Subscription No.20250119633 which expires on 04/16/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes:(6973bedd6a6b3f8154ebff62) 6 [   ]     §B.3.3.2.1 Property insurance of the same type and scope satisfying the requirements identified in Section B.2.3,which,if selected in this Section B.3.3.2.1,relieves the Owner of the responsibility to purchase and maintain such insurance except insurance required by Section B.2.3.1.3 and Section B.2.3.3.The Construction Manager shall comply with all obligations of the Owner under Section B.2.3 except to the extent provided below.The Construction Manager shall disclose to the Owner the amount of any deductible,and the Owner shall be responsible for losses within the deductible.Upon request,the Construction Manager shall provide the Owner with a copy of the property insurance policy or policies required.The Owner shall adjust and settle the loss with the insurer and be the trustee of the proceeds of the property insurance in accordance with Article 11 of the General Conditions unless otherwise set forth below: (Where the Construction Manager’s obligation to provide property insurance differs from the Owner’s obligations as described under Section B.2.3,indicate such differences in the space below.Additionally,if a party other than the Owner will be responsible for adjusting and settling a loss with the insurer and acting as the trustee of the proceeds of property insurance in accordance with Article 11 of the General Conditions,indicate the responsible party below.) [   ]     §B.3.3.2.2 Railroad Protective Liability Insurance,with policy limits of not less than ($)per claim and ($) in the aggregate,for Work within fifty (50)feet of railroad property. [   ]     §B.3.3.2.3 Asbestos Abatement Liability Insurance,with policy limits of not less than ($)per claim and ($) in the aggregate,for liability arising from the encapsulation,removal,handling,storage,transportation,and disposal of asbestos-containing materials. [   ]     §B.3.3.2.4 Insurance for physical damage to property while it is in storage and in transit to the construction site on an “all-risks”completed value form. [   ]     §B.3.3.2.5 Property insurance on an “all-risks”completed value form,covering property owned by the Construction Manager and used on the Project,including scaffolding and other equipment. [X ]     §B.3.3.2.6 Other Insurance (List below any other insurance coverage to be provided by the Construction Manager and any applicable limits.) Coverage Limits Umbrella Excess Liability Insurance Ten Million Dollars and Zero Cents ($10,000,000.00)per occurenece/aggregate  §B.3.4 Performance Bond and Payment Bond The Construction Manager shall provide surety bonds,from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located,as follows: (Specify type and penal sum of bonds.) Type Penal Sum ($0.00) Payment Bond $143,272.00 Performance Bond $143,272.00 Payment and Performance Bonds shall be AIA Document A312™,Payment Bond and Performance Bond,or contain provisions identical to AIA Document A312™,current as of the date of this Agreement. ARTICLE B.4   SPECIAL TERMS AND CONDITIONS Special terms and conditions that modify this Insurance and Bonds Exhibit,if any,are as follows: Not Applicable  Docusign Envelope ID: A395467B-087E-4B7D-B728-1C69815AF08C